1

 

 

Converting Forged Camshaft of one of its esteemed customers to a Tubular camshaft.

Sintered connecting rods

 

 

Capabilities:

  • Right First time approach. Last 14 projects have seen single shot clearance with our Customers.
  • In-house capability to design & develop fixtures and tooling for manufacturing.
  • Capability to suggest alternate designs for converting conventional connecting rod design to fracture-split design and manufacturing of the same.
  • You design; we make it. Our in-house team is capable of designing and manufacturing limited quantities or bulk requirements with a turnaround time of 12 weeks from design to first sample and further 2 weeks for manufacturing
  • Development of Prototypes: Our strategic tie-ups with various suppliers ensure we develop prototypes of your design in the quickest possible time frame at an acceptable cost
1 1 1
 
     
  Copyright © 2015 Fortuna Engineering  

Enquiry | About us |

1